Phase II –
the island structure (sounds like something from an aircraft carrier!)
|
We sat
the Advantech subfloor up on the sawhorses and marked the cooktop cutout using
a Sharpie marker.
|
|
After
extensive checks and counter-checks, I was satisfied the piece was as properly
aligned as my “finger feeler-gauges” could achieve and I clamped the piece
using a 2X4 top board.
|
|
Once the
first course glue set overnight, I was ready for the second course.
|
| I made an access cut along the edge of the cook top cutout but left plenty of “meat” to allow a strong piece. The cutout simply allows clamps to be applied a little closer. |
|
Liberal
use of release sheets (plastic grocery bags) will help insure I do not
accidentally glue a pressure block to the maple flooring!
|
|
A couple
of 12” deep throat C-clamps help reach the work more easily. They won’t hold
the same clamping force as the normal C-clamps, but they are sufficient.
|
|
Long shot
of final layup for second course.
|
Next - Additional
courses will be done similarly and I will not update as I go unless I change
some method or other.